Skip to main content
Australian Transport Assesment and Planning

Top bar

  • Public Consultation
  • category 1About
  • category 2User Guide
  • category 3Framework
  • category 4Tools and Techniques
  • category 5Parameter Values
  • category 6Mode Specific Guidance
  • category 7Worked examples
  • category 8Technical support library
  • category 9Other Guidance
  1. Home
  2. Worked examples

Worked Examples

Worked examples seek to demonstrate the application of ATAP Guidance (refer to Introduction to ATAP worked examples page).

Currently worked examples are provided for

  • W1 Public Transport 1.1 Simple bus route improvement
  • W1 Public Transport 1.2 New fixed track facility
  • W3 Rail Freight 3.1 Metro
  • W3 Rail Freight 3.2 Rural
  • W4 Active Travel: 4.1 Pedestrian / cycle signalised crossing or overpass
  • W4 Active Travel: 4.2 Missing cycleway segment

Further worked examples will be added progressively in the future.

  • category 1About
  • category 2User Guide
  • category 3Framework
  • category 4Tools and Techniques
  • category 5Parameter Values
  • category 6Mode Specific Guidance
  • category 7Worked examples
    • Introduction
    • W1 Public Transport: 1.1 Simple bus route improvement
    • W1 Public Transport: 1.2 New fixed track facility
    • W2 Road transport
    • W3 Rail Freight 3.1 Metro
    • W3 Rail Freight 3.2 Rural
    • W4 Active Travel: 4.1 Pedestrian/cycle signalised crossing or overpass
    • W4 Active Travel: 4.2 Missing cycleway segment
    • W5 Travel behaviour change
  • category 8Technical support library
  • category 9Other Guidance

Footer

  • Feedback
  • Privacy
  • Copyright
  • Disclaimer
  • Department
  • australia.gov.au
Back to top